How to price a cleaning tender
Most losing cleaning prices are not too high. They are built on the wrong hours or the wrong labour cost, and the firm that wins them loses money for three years. This walkthrough builds a price from the specification up, with the 2026 UK wage and employer rates and their official sources.
1. Start with the specification and the hours
Labour is usually most of a cleaning price, so the hours drive everything. Work them out from the specification: areas, floor types, frequencies and any periodic tasks such as deep cleans, high-level cleaning or window cleaning. If the pack gives current hours or a staff list, compare them with your own estimate. A big gap is a question to ask the buyer before the clarification deadline, not a gap to fill with hope.
Remember the time that is not cleaning: travel between sites, supervision, induction, training, and covering for sickness and holiday.
2. Build the labour cost per hour
Start from the pay rate, then add the costs that come with every paid hour. The rates below are the official 2026 figures; check them again before you submit, because they change every April.
| Cost | 2026 rule | Source |
|---|---|---|
| Minimum pay | National Living Wage £12.71 an hour (21 and over) from 1 April 2026; £10.85 for 18 to 20 | gov.uk National Minimum Wage rates |
| Holiday | 5.6 weeks a year for a worker (28 days on a five-day week); bank holidays can be included | gov.uk holiday entitlement |
| Employer National Insurance | 15% on earnings above £96 a week (£5,000 a year) in 2026 to 2027; Employment Allowance up to £10,500 for eligible employers | HMRC rates and thresholds 2026 to 2027 |
| Workplace pension | Employer pays at least 3% of earnings between £6,240 and £50,270 a year for enrolled staff | gov.uk workplace pensions |
| Real Living Wage (voluntary) | £14.10 an hour UK and £15.45 in London, announced 15 October 2026; accredited employers have until 1 May 2027 | Living Wage Foundation |
The Real Living Wage is voluntary, but some buyers ask for it in the contract or reward it as social value. If the specification asks for it, price it from the start date and for every later year.
An illustrative example
These figures are invented to show the method, not a quote. Take a cleaner on 20 hours a week paid the National Living Wage of £12.71:
| Item | Working | Per hour worked |
|---|---|---|
| Pay | National Living Wage | £12.71 |
| Holiday cover | 5.6 weeks paid off and covered by someone else: 5.6 / 46.4 working weeks ≈ 12.1% | £1.53 |
| Employer NI | Weekly pay £254.20; 15% of (£254.20 − £96) = £23.73 a week, before any Employment Allowance | £1.19 |
| Pension | 3% of (£254.20 − £120 lower band per week) = £4.03 a week | £0.20 |
| Direct labour cost | Before supervision, sickness, training and overheads | ≈ £15.63 |
Rounding, holiday pay on NI, sickness absence and different hours per person all move this figure, so build it in a spreadsheet for the real staff list. The point is that the cost of a "£12.71 cleaner" is well over £15 an hour before you have paid for a single mop.
3. TUPE: price the people you will inherit
When a cleaning contract moves to a new contractor, the cleaners who work on it usually transfer on their existing terms. The outgoing employer must give the new employer employee liability information at least 28 days before the transfer, but you need the figures much earlier to price. Use the staff data in the tender pack: hours, pay rates, holiday above the minimum, pension and length of service. If it is missing or thin, ask for it in a clarification question. My guide to TUPE in cleaning tenders covers what to check.
4. Consumables, equipment and overheads
- Consumables: chemicals, liners, and washroom supplies if the specification includes them. These can be large on washroom-heavy sites, so check who supplies paper and soap.
- Equipment: machines, trolleys and their replacement over the contract life.
- Supervision and management: site supervisors, area managers, audits and reporting against the contract KPIs.
- Overheads: insurance, vetting checks, uniforms, training, payroll and your share of office costs.
- Mobilisation: recruitment, induction and first-month inefficiency.
5. Margin and risk
Add a margin you can live with, then test the risks. The biggest one is wage increases: the National Living Wage changes every April, so check whether the contract has a price review or indexation clause. If it does not, you carry every rise for the whole term. Also check payment terms, service credits for missed standards and what happens if the buyer changes the hours.
6. Price against the weighting
A contract scored mostly on price rewards a lean bid; one scored mostly on quality rewards a strong method statement and a realistic price. Never cut the hours below what the specification needs to win on price. Evaluators often test prices that look abnormally low, and a contract you cannot staff damages your reputation with the next buyer too.
Sources
- gov.uk: National Minimum Wage and National Living Wage rates
- HMRC: rates and thresholds for employers 2026 to 2027
- gov.uk: workplace pensions, what you and your employer pay
- gov.uk: holiday entitlement
- gov.uk: information about employees during transfers (TUPE)
- Living Wage Foundation: what is the real Living Wage
Rates checked on 18 October 2026. The example is illustrative. This is not legal, tax or financial advice; check current rates and take advice for your own business.
Frequently asked questions
What hourly rate should I charge for a cleaning tender?
There is no single right rate. Build it from your labour cost per hour (pay, holiday cover, employer NI and pension), then add supervision, consumables, equipment, overheads, margin and risk. On the National Living Wage the direct labour cost alone is well over £15 an hour.
Do I have to pay the Real Living Wage on a public cleaning contract?
Only if the contract requires it or you have committed to it. It is voluntary, but some buyers ask for it or reward it as social value, so read the specification and price it for every contract year if it is required.
How do wage rises affect a three-year cleaning contract?
The National Living Wage changes every April. Check whether the contract has a price review or indexation clause; without one, you carry every rise for the whole term, so build expected rises into your price.
Found a tender and not sure it is worth a bid? I read the notice and the tender pack and send a one-page go/no-go check as a PDF by email, within one working day of receiving the pack. It is £95 fixed, and every check says what I did and did not read.
I am also offering a free founding check to the first few UK limited companies, LLPs or plcs in cleaning, facilities management or IT with a tender deadline at least 5 working days away.
Request a free founding check Order a £95 go/no-go check
Prefer to do it yourself first? Use the free 10-question should-we-bid check.